EMAL • Al Taweelah, Abu Dhabi

Execution Period:  2011 - 2013

Project Description

In 2007 construction started on the world’s largest single-site aluminium smelter complex for Emirates Aluminium (EMAL) in Abu Dhabi. 

EMAL Phase I included the construction of a 750 thousand tonne (yearly) mega smelter and a 2.000-MW thermal power plant. During EMAL II 1.000 MW of generating capacity was added to the power plant, as well as a 1.6-kilometre potline, the longest ever built, and the world’s highest-rated rectifier transformer. Between 2011 and 2013 Click-Fit has provided EMAL with more than 250 network components.

132 kV Project Phases

  • EMAL I :  2.000-MW thermal power plant – 60 GIS Connectors + 20 Link Boxes
  • EMAL II:  1.000-MW additional capacity – 132 GIS Connectors + 44 Link Boxes

Key Succes Factors

  • Introduction of new cable technology with positive results

  • Cooperative interaction between sales team, project team and customer

  • Ability to connect cable with Welded Aluminium Sheath construction with ClickFit accessories

Network Components

GIS Connector Link Box
Network Components 192 64

Choosing Click-Fit means: 
the right experience and expertise to fit our solutions to your cable system.

Click-Fit

Schieweg 9
2627 AN Delft, Netherlands

PO Box 495
2600 AL Delft, Netherlands

T. +31 (0)88 – 808 4444       
E. info@click-fit.org

Contact us

Send →