TenneT - Noordoostpolder, Netherlands

In the Noordoostpolder there are many initiatives for the generation of renewable energy.  The newly built Noordoostpolder wind farm, consisting of 86 mills, will generate sufficient energy to supply 400 thousand households (1,3 billion kWh per year).

Read more →

EMAL – Al Taweelah, Abu Dhabi

In 2007 construction started on the world’s largest single-site aluminium smelter complex for Emirates Aluminium (EMAL) in Abu Dhabi.

Read more →

Iberdrola/50 Hz – Wikinger Offshore Platform, Spain

This two piece transformer platform of the substation for the Wikinger Offshore Windfarm has been installed in the Baltic Sea.

Read more  →

TenneT TSO – BorWin 2 Offshore Platform, Germany

With the BorWin2 project, TenneT has realized a 200 kilometers long, 800 megawatt direct current (DC) grid connection.

Read more  →

Sochi Olympics 2014 – Russia

The 2014 Winter Olympics, officially called the XXII Olympic Winter Games and commonly known as Sochi 2014, were a major international multi-sport event held from 7 to 23 February 2014 in Sochi, Russia.

Read more  →

Our partners all over the world

Siemens  |  TenneT  |  Réseau de Transport d’Électricité (RTE)  |  Red Eléctrica de España (REE)  |  Infratek  |  Vattenfall  |  Alstom  |  Scottish Power  |  Stedin  |  Liandon  |  National Grid  |  Asea Brown Boveri (ABB)  |  Petrofac  |  Potomac Electric Power Company (PEPCO)  |  Estralin Power Systems  |  Taihan Electric Wire  |  Abu Dhabi Transmission & Despatch Company (Transco)  |  Dubai Electricity and Water Authority (Dewa)
and many others

Choosing Click-Fit means: 
the right experience and expertise to fit our solutions to your cable system.

Click-Fit

Schieweg 9
2627 AN Delft, Netherlands

PO Box 495
2600 AL Delft, Netherlands

T. +31 (0)88 – 808 4444       
E. info@click-fit.org

Contact us

Send →